With the foundation in place the carpenters have been busy with framing the walls and floor at our West side addition project. This addition does not have flush connections with any of the exisitng walls of the house so we are able to utilize typical high energy 2×6 wall framing. We are of cours aligning the second floor with the existing second floor level. We will also align and match the new roof to the existing roof. We’ve had good weather for this portion of the project. Stay tuned.
-
NCC Residential
-
NCC Commercial
-
Subscription
You can subscribe to NCC blog content through our RSS feed or our e-mail mailing list.
-
Business links
-
Community
-
Blog Categories
-
Pages


