Three Links windows

100_2623 Our workers have been making good progress on our Three Links remodeling project. The clear, dry weather has allowed them to move along well with the window replacements. They have a good process in place for100_2624 removing the existing windows and keeping the dust and debris to a minimum. It really helps to have equipment with vacuum attachments right at the cutting head. The all wheel drive scissor lifts also help in providing good access to the second and third level windows.