Wells Fargo, Phase II

100_2519brighter Phase two of our Wells Fargo bank remodeling project is100_2522 starting to wind down. Phase one work included a new teller line which has been installed. It looks great and is working nicely for bank customers. It includes solid surface work counters which should serve the bank well for many, many years.

100_2520 The phase two work has involved reconfiguration of100_2521 the ceilings where the old teller lines were located, as well as creating new offices where the old bank entrance was located. The new hollow metal door frames have been installed and glass will arrive shortly. We are re-using many of the existing doors. The majority of the doors were in good condition and salvaging them made good sense.

100_2523 The new entrance is handicap accessible with automatic door operators. These work at the push of a button and make it much easier for people with mobility problems to enter the bank.